How much does it cost to renovate a house?

Just bought a tired house, or finally getting yours up to standard? Renovation budgets vary more than any other project because "renovate" covers everything from paint to a back-to-brick rebuild. Here is a realistic way to frame it for a typical three-bed in our area.

Three levels of renovation

LevelWhat it coversTypical three-bed budget (2026)
Light refreshDecoration, flooring, minor repairs£15,000 to £30,000
Medium refurbishmentNew kitchen and bathroom, some rewiring, replastering, decoration£40,000 to £75,000
Full renovationStrip-out, full rewire, new heating, replaster, new kitchen and bathrooms, possible structural changes£75,000 to £150,000+

The big-ticket items

  • Full rewire: typically £5,000 to £9,000 depending on size and finish.
  • New heating system with boiler and radiators: £5,000 to £8,000.
  • Replastering throughout: £8,000 to £15,000.
  • Kitchen supplied and fitted: from £11,000. Bathroom: from £6,500.
  • Windows throughout: £8,000 to £15,000 depending on style.

Sequence is everything

The expensive mistake in renovation is doing work twice: decorating before the rewire, tiling before the plumbing moves. The right order is strip-out, structural, first fix (wires and pipes), plaster, second fix, kitchens and bathrooms, then decoration. Project-managing every trade in that order on one programme is exactly what a design and build team is for.

Older houses, honestly handled

Much of the housing around Enfield and Cheshunt is Victorian to 1930s. Budget honestly for what these houses hide: old wiring, damp needing proper treatment rather than a coat of paint, and lath-and-plaster ceilings. A contingency of around 10% is not pessimism, it is experience.

Frequently asked questions

Can I live in the house during a full renovation?+

For light and some medium refurbishments, yes, in phases. A full strip-out is faster, cheaper and far less stressful with the house empty, and we will tell you honestly which yours is.

Do I need planning permission to renovate?+

Internal renovation almost never needs planning permission, though building control applies to electrics, structural work and sometimes windows. Listed buildings and flats have extra rules.

How long does a full renovation take?+

A full three-bed renovation typically runs 12 to 20 weeks on site depending on structural work, and we give you a room-by-room programme with the quote.

Free instant quote

Want a figure for your own project?

An indicative, itemised budget in about a minute, emailed straight to you as a branded PDF. We confirm a fixed price after a free, no-obligation site visit.

Start my free estimate

See your build cost

Free · itemised · 60 seconds

Get quote